Coastal Erosion Protection – Engineered Stone Revetment Installation at Low Point Lighthouse

Registry Search Mobile

Registry Search

Skip to Filters

2 results

Document Public Comment Period on Intent to Make a Determination

  • Project Coastal Erosion Protection – Engineered Stone Revetment Installation at Low Point Lighthouse
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2026-05-15
  • Document: 166573E.html
  • Relevance: 399.75
  • Public Comment Period on Intent to Make a Determination Coastal Erosion Protection – Engineered Stone Revetment Installation at Low Point Lighthouse May 15, 2026 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be ...
1 alternate format found
French HTML
  • Relevance: 348.75
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Protection contre l'érosion côtière – Installation d'un revêtement en pierres artificielles au phare de Low Point Le 15 mai 2026 — Le ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le ministère de la Défense nationale invite le public à ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Document Category Display Filters

Date modified: